Re: NISA - Nuclear and Industrial Safety Agency Press Releases
Japanese to English translation
Earthquake Information (Report No. 90)
(currently 00 minutes at the 8th April 13)
Changes from the previous below.
1. Related nuclear power plant
○ Fukushima Daiichi Nuclear Power Station
The retention of water - the water pump of Unit 2 turbine building of the trench and started to transfer the condenser hot well (April 12, 19:35).
- temporary water stop No. 2 on the ocean side of the bar screen (1 of 7 sheets) is established (April 12).
- For the Unit 3 spent fuel pool cooling, concrete pump trucks (50t / h) of about 35t fresh water discharge (April 12, 16:26 to 17:16).
- spent fuel pool cooling for Unit 4, concrete pump trucks (50t / h) of about 195t freshwater discharge (April 13, 00:30 to 06:57).
2. Industrial Safety Relationship
See Appendix
...
Earthquake Information (Part 91)
(current 15:00, 13 April)
The main changes are as follows from the last time.
1. Related nuclear power plant
○ Fukushima Daiichi Nuclear Power Station
The retention of water - the water pump of Unit 2 turbine building of the trench and started to transfer the condenser hot well (April 12, 19:35). Check for leaks, etc., suspended (11:00, April 13.)
Injected into the spent fuel pool - fresh water from the spent fuel pool cooling system of Unit 2 (April 13, 13:15 to 14:55)
April 13 8:00 - shared pool water temperature is about spent fuel at the time ℃ 29.
- Two temporary steel water stop on the ocean side of the bar screen No. 2 (3 total) established (April 13, 8:30 to 10:00 time around.)
- Complete set 3-4 silt fence to prevent spread of contaminated water in front of the screen Unit (April 13, 13:50)
2. Industrial Safety Relationship
See Appendix
<the possibility of employee exposure, such as>
April 1 around 11:35, when boarding the ship from the shore for the boat barge hose rework the U.S. military, one fell into the sea workers. Rescue workers are now around, there was no external contamination and injury, just in case, the result of measurement Horubodikaunta were evaluated on April 12 without internal capture.
<directions to the food and drink>
Update restricted intake restricted item shipped. (15:00, April 13 now)
...
Japanese to English translation
Earthquake Information (Report No. 90)
(currently 00 minutes at the 8th April 13)
Changes from the previous below.
1. Related nuclear power plant
○ Fukushima Daiichi Nuclear Power Station
The retention of water - the water pump of Unit 2 turbine building of the trench and started to transfer the condenser hot well (April 12, 19:35).
- temporary water stop No. 2 on the ocean side of the bar screen (1 of 7 sheets) is established (April 12).
- For the Unit 3 spent fuel pool cooling, concrete pump trucks (50t / h) of about 35t fresh water discharge (April 12, 16:26 to 17:16).
- spent fuel pool cooling for Unit 4, concrete pump trucks (50t / h) of about 195t freshwater discharge (April 13, 00:30 to 06:57).
2. Industrial Safety Relationship
See Appendix
...
Earthquake Information (Part 91)
(current 15:00, 13 April)
The main changes are as follows from the last time.
1. Related nuclear power plant
○ Fukushima Daiichi Nuclear Power Station
The retention of water - the water pump of Unit 2 turbine building of the trench and started to transfer the condenser hot well (April 12, 19:35). Check for leaks, etc., suspended (11:00, April 13.)
Injected into the spent fuel pool - fresh water from the spent fuel pool cooling system of Unit 2 (April 13, 13:15 to 14:55)
April 13 8:00 - shared pool water temperature is about spent fuel at the time ℃ 29.
- Two temporary steel water stop on the ocean side of the bar screen No. 2 (3 total) established (April 13, 8:30 to 10:00 time around.)
- Complete set 3-4 silt fence to prevent spread of contaminated water in front of the screen Unit (April 13, 13:50)
2. Industrial Safety Relationship
See Appendix
<the possibility of employee exposure, such as>
April 1 around 11:35, when boarding the ship from the shore for the boat barge hose rework the U.S. military, one fell into the sea workers. Rescue workers are now around, there was no external contamination and injury, just in case, the result of measurement Horubodikaunta were evaluated on April 12 without internal capture.
<directions to the food and drink>
Update restricted intake restricted item shipped. (15:00, April 13 now)
...
Comment