• FluTrackers.com Inc. does not provide medical advice. Information on this web site is collected from various internet resources, and the FluTrackers board of directors makes no warranty to the safety, efficacy, correctness or completeness of the information posted on this site by any author or poster. The information collated here is for instructional and/or discussion purposes only and is NOT intended to diagnose or treat any disease, illness, or other medical condition. Every individual reader or poster should seek advice from their personal physician/healthcare practitioner before considering or using any interventions that are discussed on this website. By continuing to access this website you agree to consult your personal physican before using any interventions posted on this website, and you agree to hold harmless FluTrackers.com Inc., the board of directors, the members, and all authors and posters for any effects from use of any medication, supplement, vitamin or other substance, device, intervention, etc. mentioned in posts on this website, or other internet venues referenced in posts on this website.
  • We are not asking for any donations. Do not donate to any entity who says they are raising funds for us.

Clinical characteristics of patients with infection due to Influenza A (H1N1) 2009 and critical pathology

tetano

Editor, Senior Moderator
An Pediatr (Barc). 2010 Dec 30. [Epub ahead of print]
[Clinical characteristics of patients with infection due to Influenza A (H1N1) 2009 and critical pathology.]

[Article in Spanish]

P?rez Navero JL, Rumbao Aguirre J, Correas S?nchez A, Salda?a Garc?a N, Mu?oz-Villanueva MC, Ibarra de la Rosa I.

Intensivos Pedi?tricos, Unidad de Gesti?n Cl?nica de Pediatr?a y sus Especialidades, Hospital Universitario Reina Sofia, C?rdoba, Espa?a.
Abstract

OBJECTIVE: Retrospective, observational study in children hospitalized due to Influenza A (H1N1) between October 2009 and February 2010, emphasizing on those who required intensive therapy.

MATERIAL AND METHODS: Risk factors, symptoms, course, complications, mortality, time of disappearance of RT-PCR Influenza A (H1N1), average length of stay and duration of treatment with oseltamivir, were studied, comparing critically ill patients (group I) with the rest of hospitalized patients (group II).

RESULTS: A total of 38 children, with a mean age of 5.03?4.6 years were admitted during the study period. Six patients required intensive care, 83.3% had risk factors for influenza A (H1N1) compared with 62.5% in group II. Fever > 38?C was the predominant symptom (92.1%). Respiratory symptoms were significantly more frequent in group I (83.3% vs. 33.6; P<.01). Two critically ill patients required mechanical ventilation due to ARDS (acute respiratory distress syndrome). One patient with exacerbation of chronic respiratory failure responded favourably to high-flow oxygen. One patient developed fulminant myocarditis and required ECMO (Extracorporeal Membrane Oxygenation) because of secondary cardiogenic shock, which developed into multiple organ dysfunction and brain death. Oseltamivir therapy was given for an average of 8.6 days in group I and 4.5 days in group II (P<.05), checking the negativity of RT-PCR Influenza A (H1N1) in 7?2 days. The average stay was significantly higher in group I. Two patients admitted to PICU died.

CONCLUSIONS: The presence of risk factors increases the likelihood of unfavourable outcome: high mortality among patients requiring intensive care. Monitoring of RT-PCR Influenza A (H1N1) could help establish the duration of isolation measures.
Copyright © 2010 Asociaci?n Espa?ola de Pediatr?a. Published by Elsevier Espana. All rights reserved.

PMID: 21195686 [PubMed - as supplied by publisher]

http://www.ncbi.nlm.nih.gov/pubmed/21195686
 
Back
Top Bottom