sharon sanders
Editor-in-Chief & President
Wing month Delivery (Reporter Li Mei-ling) yesterday, Airbus announced the first in China has completed assembly and testing of the A320 wing will be delivered next month, Airbus final assembly line in Tianjin.
At present, Airbus final assembly line in Tianjin has already reached the level of two aircraft per month.
In 2009, the Airbus A320 Family aircraft have completed final assembly line in Tianjin assembly six A320 aircraft and five A319-fei
http://translate.googleusercontent.com/translate_c?hl=en&langpair=auto|en&u=http://blog.bjnews.com.cn/space.php%3Fuid%3D21668%26do%3Dblog%26classid%3D384%26view%3Dme&rurl=translate.google.com&usg=ALkJrhhGBMCDJUhjDfHufIcd8O7TgUzM4g
目前,空客天津总装线已经达到月产两架飞机的水平。
At present, Airbus final assembly line in Tianjin has already reached the level of two aircraft per month.
到2010年,空客天津总装线将达到月产4架的水平。
By 2010, Airbus final assembly line in Tianjin will reach the level of 4 per month.
2009年,空中客车A320系列飞机天津总装线共完成总装6架A320飞机和5架A319飞
In 2009, the Airbus A320 Family aircraft have completed final assembly line in Tianjin assembly six A320 aircraft and five A319-fei
http://translate.googleusercontent.com/translate_c?hl=en&langpair=auto|en&u=http://blog.bjnews.com.cn/space.php%3Fuid%3D21668%26do%3Dblog%26classid%3D384%26view%3Dme&rurl=translate.google.com&usg=ALkJrhhGBMCDJUhjDfHufIcd8O7TgUzM4g