• FluTrackers.com Inc. does not provide medical advice. Information on this web site is collected from various internet resources, and the FluTrackers board of directors makes no warranty to the safety, efficacy, correctness or completeness of the information posted on this site by any author or poster. The information collated here is for instructional and/or discussion purposes only and is NOT intended to diagnose or treat any disease, illness, or other medical condition. Every individual reader or poster should seek advice from their personal physician/healthcare practitioner before considering or using any interventions that are discussed on this website. By continuing to access this website you agree to consult your personal physican before using any interventions posted on this website, and you agree to hold harmless FluTrackers.com Inc., the board of directors, the members, and all authors and posters for any effects from use of any medication, supplement, vitamin or other substance, device, intervention, etc. mentioned in posts on this website, or other internet venues referenced in posts on this website.
  • We are not asking for any donations. Do not donate to any entity who says they are raising funds for us.

Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 - April 20, 2011

Status
Not open for further replies.
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

http://www.nytimes.com/2011/04/17/world/asia/17nuke.html?src=mv
Levels of Radioactive Materials Rise Near Japanese Plant
By THE ASSOCIATED PRESS
Published: April 16, 2011


TOKYO (AP) ? Levels of radioactive materials have risen sharply again in seawater near the troubled Fukushima Daiichi nuclear plant in northern Japan, raising the possibility of new leaks at the complex, the government said Saturday........
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Press releases from April 16;

(Apr 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00AM)
http://www.tepco.co.jp/en/press/corp-com/release/11041601-e.html

(Apr 16,2011)Receipt of instruction document from NISA regarding discharge of drained water with concentrations of radioactive materials exceeding discharge standard to the ocean
http://www.tepco.co.jp/en/press/corp-com/release/11041602-e.html

(Apr 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:00 am, April 16)
http://www.tepco.co.jp/en/press/corp-com/release/11041603-e.html

(Apr 16,2011)The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (22nd release)
http://www.tepco.co.jp/en/press/corp-com/release/11041604-e.html

(Apr 16,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, April 16th)
http://www.tepco.co.jp/en/press/corp-com/release/11041605-e.html

(Apr 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 4:00PM)
http://www.tepco.co.jp/en/press/corp-com/release/11041606-e.html

(Apr 16,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (24th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041607-e.html

(Apr 16,2011)Out flow of fluid containing radioactive materials to the ocean from areas near intake canal of Fukushima Daiichi Nuclear Power Station Unit 2 (continued report 12)
http://www.tepco.co.jp/en/press/corp-com/release/11041608-e.html

(Apr 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 7:00 pm, April 16
http://www.tepco.co.jp/en/press/corp-com/release/11041609-e.html


http://www.tepco.co.jp/en/press/corp-com/release/index-e.html
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Fukushima Daiichi Nuclear Power Station(F1) live cam
05:00 AM to 19:00 PM(up date frequency 1time/h)

4/17 17:00 PM
75778377_org.v1303031133.jpg

NHK

Dosimeters to be distributed to public schools

As radioactive substances continue to leak from the crippled Fukushima Daiichi nuclear plant, the Japanese government has decided to distribute dosimeters to all public schools in Fukushima prefecture.....

Sunday, April 17, 2011 06:49 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_02.html

TEPCO finalizes plan to cool down reactors

The operator of the crippled Fukushima Daiichi nuclear power plant has finalized a new plan to cool down the troubled reactors. Tokyo Electric Power Company will install a new cooling system that filters contaminated water and recirculates it back into the reactors.....
17_06_v_s.jpg
Sunday, April 17, 2011 09:20 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_06.html

Kan contributes message to English-language papers

Prime Minister Naoto Kan has asked the international community to act calmly, stressing that all Japanese food and other products are safe as strict scientific criteria were introduced after the nuclear accident.....
42Z20110417GZ0JPG0000360050.jpg
sankei news
Sunday, April 17, 2011 10:46 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_08.html

Work under way for transfer of contaminated water

The level of radioactive water that has accumulated on the premises of the Fukushima Daiichi nuclear power plant keeps rising amid concern that the water might overflow, further polluting the ocean.....

Sunday, April 17, 2011 14:34 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_11.html

TEPCO issues 6-9 month containment plan

The operator of the damaged Fukushima Daiichi nuclear power plant has issued a schedule for putting the crisis under control in 6 to 9 months.....
17_15_v_s.jpg
Sunday, April 17, 2011 16:35 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_15.html
________________________
Yomiuri online

TEPCO ignored tsunami warnings for years

This is the sixth and final installment in a series focusing on delays in implementing emergency steps by the government and Tokyo Electric Power Co. to deal with the unprecedented nuclear crisis at the Fukushima No. 1 nuclear power plant.....

http://www.yomiuri.co.jp/dy/national/T110416002672.htm

U.S. military sent 3 N-teams to offer help

The U.S. Air Force, Army and Marine Corps all deployed nuclear crisis response teams to Japan in late March and early April to offer help with the ongoing crisis caused by the Fukushima No. 1 nuclear power plant, The Yomiuri Shimbun has learned.....

http://www.yomiuri.co.jp/dy/national/T110416002649.htm

N-workers to receive long-term health checks

The government plans to create a database to monitor the long-term health of workers at the crippled Fukushima No. 1 nuclear power plant, it was learned Saturday.
According to government sources, the aim of the database is to study whether workers have been subject to radiation exposure, and the effects of such exposure, if any, over a period of more than 30 years......

http://www.yomiuri.co.jp/dy/national/T110416002868.htm
__________________________
Asahi com

Radiation fears heap fresh calamity on quake survivors

Fear of radioactive contamination from the stricken Fukushima No. 1 nuclear power plant is driving down prices of food products from areas near the plant, piling on the misery for producers struggling to recover from the Great East Japan Earthquake. .....

http://www.asahi.com/english/TKY201104160125.html

TEPCO discharges less radioactive water than planned

More than 10,000 tons of water with low levels of radioactivity have been poured into the ocean from the Fukushima No. 1 nuclear power plant to make room for highly radioactive water, officials said. .....

http://www.asahi.com/english/TKY201104160126.html
____________________
Mainichi jp

Brazil may ease import restrictions when nuclear crisis subdues

TOKYO (Kyodo) -- Visiting Brazilian Foreign Minister Antonio Patriota said Saturday that his country will study easing its current import restrictions on Japanese food items once the nuclear crisis at the Fukushima Daiichi power station improves......

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm006000c.html

Fukuyama apologizes to Iitate villagers for anxieties

IITATE (Kyodo) -- Deputy Chief Cabinet Secretary Tetsuro Fukuyama apologized Saturday to residents of Iitate whose village the government has said is to be added to the evacuation zone due to fears about radiation from the crippled Fukushima nuclear power plant.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm007000c.html

U.S. offers unmanned chopper to help remove Fukushima spent fuel

TOKYO (Kyodo) -- The U.S. government has told Japan that it can use a U.S. unmanned cargo transport helicopter to set up cranes to remove spent fuel rods from storage pools at the crippled Fukushima nuclear power plant, Japanese and U.S. sources close to the matter said Saturday.......

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm008000c.html

Japan nuclear commission fails to send experts to Fukushima

TOKYO (Kyodo) -- The Nuclear Safety Commission of Japan has failed to send designated experts to Fukushima Prefecture to look into the crisis at the crippled Fukushima Daiichi nuclear power plant even though a national disaster-preparedness plan requires it to do so, many of the experts said Saturday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm009000c.html

Gov't OKs raw milk shipments from another 25 Fukushima municipalities

TOKYO (Kyodo) -- The government lifted its ban on shipments of raw milk from another 25 municipalities in Fukushima Prefecture on Saturday, citing continuous declines in levels of radioactive substances, government officials said.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm010000c.html

Japan's PM shows deep 'regret' over nuclear crisis

NEW YORK (Kyodo) -- Japanese Prime Minister Naoto Kan expressed deep "regret" over the ongoing crisis at the Fukushima nuclear power plant in his country in an article contributed to several English newspapers.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm012000c.html

Accumulated radiation tops 17,000 microsieverts in Fukushima's Namie

TOKYO (Kyodo) -- The accumulated radiation level in Namie, 30 kilometers from the crippled Fukushima Daiichi nuclear power plant, in the three weeks through Friday stood at 17,010 microsieverts, according to a tally released by the science ministry Saturday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm013000c.html

New cooling systems may be installed outside Fukushima reactor buildings

TOKYO (Kyodo) -- Tokyo Electric Power Co. is considering installing circulating water cooling systems for nuclear reactors and spent fuel storage pools outside the reactor buildings at its crippled Fukushima Daiichi nuclear plant, sources familiar with the matter said Saturday.....
snap20110417185409.jpg
http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm014000c.html

Fukushima seawater radioactivity rises inside containment fence

TOKYO (Kyodo) -- The level of radioactive substances in seawater increased sharply overnight inside a containment fence installed near the Fukushima Daiichi nuclear power plant, the operator Tokyo Electric Power Co. said Saturday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm015000c.html

Chronology of events surrounding crippled Fukushima nuclear plant

TOKYO (Kyodo) -- The following is a chronology of events regarding the nuclear crisis at the Fukushima No. 1 nuclear power station in Fukushima Prefecture, triggered by the March 11 earthquake and tsunami.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm060000c.html

TEPCO to use robots to examine reactor building conditions

Tokyo Electric Power Co. said Sunday it would later in the day use robots to examine the temperature, radiation level, and oxygen concentration inside a reactor building at its troubled Fukushima No. 1 nuclear power plant.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm073000c.html

TEPCO aims to achieve 'cold shutdown' for reactors in 6-9 months

TOKYO (Kyodo) -- Tokyo Electric Power Co. said Sunday that it aims to bring the damaged reactors at the Fukushima No. 1 nuclear power plant to a stable condition known as a "cold shutdown" in about six to nine months, while restoring stable cooling to the reactors and spent fuel pools in about three months.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm074000c.html

44 Filipinos flee Japan region hit by nuke crisis

MANILA, Philippines (AP) -- The Philippine government has flown 44 Filipino women and children home from northeastern Japan after urging about 2,000 of its nationals to leave the region because of its nuclear crisis.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm075000c.html

TEPCO announces plan to end Japan nuclear crisis

TOKYO (AP) -- The operator of the crippled nuclear power plant leaking radiation in northern Japan announced a plan Sunday that would bring the crisis under control within six to nine months and allow evacuated residents to return to their homes.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/17/20110417p2g00m0dm077000c.html
______________
Jiji com

snap20110417190143.jpgrobot
_________________
Sankei news

dst11041719310031-p1.jpg
dst11041719310031-p2.jpg
dst11041719310031-p3.jpg
at unit 3

panorama photo

"20 Km" away from F1, Fukushima pref
http://photo.sankei.jp.msn.com/panorama/data/2011/0409namie/

"ghost town" Minamisoma city, Fukushima pref
http://photo.sankei.jp.msn.com/panorama/data/2011/0412minami-souma/
http://photo.sankei.jp.msn.com/panorama/data/2011/0414minami-souma/

"search" 20 km point, Fukushima pref
http://photo.sankei.jp.msn.com/panorama/data/2011/0411minami-souma/

"search" 7 km point, Fukushima pref
http://photo.sankei.jp.msn.com/panorama/data/2011/0415-7km3/
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

April 17 press releases;

(Apr 17,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 0:00 pm, April 17
http://www.tepco.co.jp/en/press/corp-com/release/11041701-e.html

(Apr 17,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (25th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041702-e.html

(Apr 17,2011)The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (23rd release)
http://www.tepco.co.jp/en/press/corp-com/release/11041703-e.html

(Apr 17,2011)Out flow of fluid containing radioactive materials to the ocean from areas near intake canal of Fukushima Daiichi Nuclear Power Station Unit 2 (continued report 13)
http://www.tepco.co.jp/en/press/corp-com/release/11041704-e.html

(Apr 17,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, April 17th)
http://www.tepco.co.jp/en/press/corp-com/release/11041705-e.html

(Apr 17,2011)Detection of Radioactive Material from Subsurface Water near the Turbine Building of Fukushima Daiichi Nuclear Power Station
http://www.tepco.co.jp/en/press/corp-com/release/11041706-e.html

(Apr 17,2011)Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station
http://www.tepco.co.jp/en/press/corp-com/release/11041707-e.html

(Apr 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00AM)
http://www.tepco.co.jp/en/press/corp-com/release/11041708-e.html

(Apr 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00PM)
http://www.tepco.co.jp/en/press/corp-com/release/11041709-e.html

http://www.tepco.co.jp/en/press/corp-com/release/index-e.html
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Fukushima Daiichi Nuclear Power Station(F1) live cam
05:00 AM to 19:00 PM(up date frequency 1time/h)

4/18 15:00 PM
snap20110418150332.jpg

Govt may let evacuees return when plant stabilizes

Japan's industry minister has hinted that the government may be able to tell evacuees if they can return home when the Fukushima Daiichi nuclear plant is stabilized.....

Monday, April 18, 2011 00:27 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_16.html

Builders submit plans to dismantle Fukushima plant

The builders of the troubled Fukushima Daiichi nuclear power plant have submitted draft plans to dismantle the reactors over the medium to long term....
17_19_v_s.jpg
Monday, April 18, 2011 00:27 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_19.html

Kan asks for continued US help to tackle Fukushima

Japanese Prime Minister Naoto Kan has asked for continued US assistance in putting the crippled Fukushima Daiichi nuclear plant under control....
17_20_v_s.jpg
Monday, April 18, 2011 00:27 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_20.html

Robot used to investigate reactor buildings

Tokyo Electric Power Company has started using a remote-controlled robot to investigate the reactor buildings at the Fukushima Daiichi nuclear plant....

Monday, April 18, 2011 00:27 +0900 (JST)
http://www3.nhk.or.jp/daily/english/17_21.html

TEPCO issues 6-9 month containment plan

The operator of the damaged Fukushima Daiichi nuclear power plant has announced a schedule for getting the crisis under control in 6 to 9 months....

Monday, April 18, 2011 06:09 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_04.html

Workers cannot approach reactor buildings

At the Fukushima Daiichi nuclear plant, high levels of radiation have kept workers from approaching the buildings housing the first 3 reactors, which lost their cooling functions in the March 11th earthquake and tsunami.....

Monday, April 18, 2011 08:44 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_03.html

Robot measures radiation

The operator of the damaged Fukushima Daiichi nuclear power plant says the maximum radiation level inside the No. 3 reactor building is 57 millisieverts per hour.....

Monday, April 18, 2011 12:44 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_13.html

Kan urges thorough nuclear policy review

Prime Minister Naoto Kan has pledged a thorough review of the government's nuclear energy policy in the wake of Japan's nuclear emergency....

Monday, April 18, 2011 12:55 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_16.html

Edano: evacuees may return home in 6 months

Japan's Chief Cabinet Secretary says residents around the troubled Fukushima Daiichi nuclear power plant, who are currently displaced, may be able to return to their homes in 6 months at the earliest.....

Monday, April 18, 2011 13:28 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_17.html

School relocation

School children from an evacuation zone around the Fukushima Daiichi nuclear power plant have begun a new term at a school outside the zone....

Monday, April 18, 2011 14:03 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_19.html

TEPCO to prevent radioactive dust migration

The operator of the Fukushima Daiichi nuclear plant will spray a chemical hardening agent around the damaged plant to prevent the migration of radioactive dust and soil.....

Monday, April 18, 2011 18:42 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_24.html

Robots detect high levels of radiation

Remote-controlled robots have detected high levels of radiation inside the reactor buildings at the damaged Fukushima Daiichi nuclear power plant.....

Monday, April 18, 2011 18:58 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_27.html

TEPCO president apologizes at the Diet

The president of the Tokyo Electric Power Company has apologized for underestimating the possible impact of a tsunami triggered by a massive earthquake.....

Monday, April 18, 2011 18:58 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_29.html

Kan apologizes but refuses to step down now

Prime Minister Naoto Kan says the government underestimated the potential impact of a large tsunami on Japanese nuclear power plants, but that he won't resign to take responsibility......

Monday, April 18, 2011 20:20 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_28.html

Filipino, Indonesian nurses cancel Japan visits

Nearly one-sixth of the Filipino and Indonesian nurse and caregiver candidates scheduled to come to Japan have canceled their visits due to concerns about the hazardous effects of the damaged Fukushima Daiichi nuclear power plant.....

Monday, April 18, 2011 20:20 +0900 (JST)
http://www3.nhk.or.jp/daily/english/18_30.html
_____________________
Yomiuri online

New N-compensation body in pipeline

The government is considering establishing an organization for paying compensation to victims of the nuclear accident at Tokyo Electric Power Co.'s Fukushima No. 1 nuclear power plant, according to sources.....

http://www.yomiuri.co.jp/dy/national/T110417002446.htm

TEPCO says stabilization months away

Tokyo Electric Power Co. Chairman Tsunehisa Katsumata said Sunday it would take up to nine months to stabilize the ongoing nuclear crisis at the Fukushima No. 1 nuclear power plant.....

http://www.yomiuri.co.jp/dy/national/T110417002916.htm

Seawater radiation checks off N-plant to be widened

Tokyo Electric Power Co. will increase the number of locations it collects seawater samples from 10 to 16 to check levels of radioactive substances released from the Fukushima No. 1 nuclear power plant, it has been learned.....
DY20110418101407033L0.jpg
http://www.yomiuri.co.jp/dy/national/T110417002493.htm
______________________
Mainichi jp(Kyodo, AP)

Gov't to decide whether evacuees can return home after 6-9 months

TOKYO (Kyodo) -- The government will decide whether people evacuated from areas around the crippled Fukushima Daiichi nuclear power plant can return to their homes after plant operator Tokyo Electric Power Co. settles the crisis in six to nine months as it plans, industry minister Banri Kaieda said Sunday.....
snap20110418145911.jpg
http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2g00m0dm004000c.html

Some nuclear evacuees to be able to return home in future: Edano

TOKYO (Kyodo) -- Some residents evacuated from areas around the crippled Fukushima Daiichi nuclear power plant will likely be able to return home in the future, Chief Cabinet Secretary Yukio Edano said Monday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2g00m0dm008000c.html

Up to 57 millisieverts measured at Nos. 1, 3 reactor buildings

TOKYO (Kyodo) -- The radiation level inside the troubled Nos. 1 and 3 reactor buildings at the Fukushima Daiichi nuclear power plant was up to about 57 millisieverts per hour as of Sunday, data obtained by remote-controlled robots showed Monday......
20110412p2g00m0dm020000p_size5.jpg
20110412p2g00m0dm021000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2g00m0dm010000c.html

METI officials urged not to seek post-retirement jobs at utilities

TOKYO (Kyodo) -- The Ministry of Economy, Trade and Industry has urged its senior officials not to seek post-retirement jobs at utility firms, as it prepares to review its handling of atomic energy in the wake of the emergency at the Fukushima Daiichi nuclear power plant, industry minister Banri Kaieda said Monday....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2g00m0dm031000c.html

TEPCO criticized over timetable to bring crippled nuke plant under control

The controversial timetable announced by Tokyo Electric Power Co. (TEPCO) for bringing its crippled nuclear power plant under control lacks concrete measures and even includes steps that appear unfeasible......
20110418p2g00m0dm026000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2a00m0na004000c.html

Quake-affected residents remain suspicious over roadmap to end Japan nuclear crisis

Tokyo Electric Power Co. (TEPCO) unveiled a roadmap on April 17 to put its crippled nuclear power plant under control within six to nine months and allow some evacuees to return to their homes, but many residents near the center of the crisis have mixed feelings about their future and the credibility of the nuclear plant operator.....
20110413p2g00m0dm017000p_size5.jpg
20110323p2g00m0dm002000p_size5.jpg


http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2a00m0na006000c.html

Evacuees say they want jobs more than money

Residents forced to evacuate their homes or stay indoors because of the Fukushima No. 1 Nuclear Power Plant disaster are set to receive temporary compensation payments of 1 million yen per household -- or 750,000 per single-person household -- but some are saying they want jobs more than money.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2a00m0na008000c.html

Japan Nuclear Safety Commission members arrive in Fukushima 37 days after quake

Members of the Japan Nuclear Safety Commission were dispatched to Fukushima Prefecture on April 17, more than a month after a massive quake and tsunami crippled a nuclear power plant in the prefecture.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2a00m0na013000c.html

Kan touches on need to freeze plans to build nuclear facilities

TOKYO (Kyodo) -- Prime Minister Naoto Kan on Monday touched on the need to freeze Japan's plans to build new nuclear facilities in the wake of the world's worst nuclear accident in a quarter century at the Fukushima Daiichi power plant....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2g00m0dm069000c.html

Experts doubt TEPCO's timetable for bringing nuke plant under control

Experts have called into question the feasibility of the controversial timetable unveiled by the Tokyo Electric Power Co. (TEPCO) for bringing its crippled Fukushima No. 1 Nuclear Power Plant under control......

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/18/20110418p2a00m0na016000c.html
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

April 18 Press Releases;

(Apr 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:00 am, April 18)
http://www.tepco.co.jp/en/press/corp-com/release/11041801-e.html

(Apr 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00AM, April 18th)
http://www.tepco.co.jp/en/press/corp-com/release/11041802-e.html

(Apr 18,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, April 18th)
http://www.tepco.co.jp/en/press/corp-com/release/11041803-e.html

(Apr 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00PM, April 18th)
http://www.tepco.co.jp/en/press/corp-com/release/11041804-e.html

(Apr 18,2011)On the Result of Water Analysis in the Skimmer Surge Tank of Fukushima Daiichi Nuclear Power Station Unit 2
http://www.tepco.co.jp/en/press/corp-com/release/11041805-e.html

(Apr 18,2011)The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (24th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041806-e.html

(Apr 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 5:00 pm, April 18
http://www.tepco.co.jp/en/press/corp-com/release/11041807-e.html

(Apr 18,2011)Out flow of fluid containing radioactive materials to the ocean from areas near intake canal of Fukushima Daiichi Nuclear Power Station Unit 2 (continued report 14)
http://www.tepco.co.jp/en/press/corp-com/release/11041808-e.html

(Apr 18,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (26th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041809-e.html

http://www.tepco.co.jp/en/press/corp-com/release/index-e.html
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Fukushima Daiichi Nuclear Power Station(F1) live cam
05:00 AM to 19:00 PM(up date frequency 1time/h)

4/19 15:00 PM, bad weather
snap20110419150147.jpg

snap20110419151332.jpgjma

NHK

TEPCO to check if plutonium leaked to seabed

The operator of the Fukushima Daiichi nuclear power plant says it will examine the seabed off the facility to ensure that no plutonium has leaked into the ocean.....

Tuesday, April 19, 2011 05:43 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_04.html

Video footage of Fukushima base camp released

The Japanese defense ministry has released video footage of a base camp for workers dealing with the crisis at the Fukushima Daiichi nuclear power plant.....
無題1.jpg
Tuesday, April 19, 2011 05:43 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_03.html

Japan's foodmakers criticize China import rules

A Japanese business representative in China has called for a measured approach to Japanese food imports amid fears of contamination from the problems at the Fukushima Daiichi nuclear plant.....

Tuesday, April 19, 2011 05:43 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_02.html

Indian police kill anti-nuclear protester in rally

Indian police have opened fire on anti-nuclear protesters, killing one person.
Hundreds of people rallied around the construction site of the Jaitapur nuclear power plant in Maharashtra, western India, on Monday.....
19_05_v_s.jpg
Tuesday, April 19, 2011 05:43 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_05.html

Japan checking exports to ease radiation fears

Japan's federation of steel makers will ask its members to check their products for radiation to combat rumors overseas that they are contaminated with radioactive materials.....

Tuesday, April 19, 2011 10:10 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_09.html

Entergy sues Vermont to keep nuclear plant running

A US energy giant has sued the state of Vermont for its decision to shut down a nuclear plant running the same type of reactor as those at the crippled Fukushima Daiichi plant.....

Tuesday, April 19, 2011 10:16 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_11.html

Russia lifts advisory against travel to Japan

Russia has lifted its advisory against travel to Japan....

Tuesday, April 19, 2011 10:54 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_12.html

Fukui gov. asks gov't for nuclear safety measures

The governor of Fukui Prefecture has urged the central government to ensure that safety measures are in place at all nuclear power plants in Japan....
19_15_v_s.jpg
Tuesday, April 19, 2011 12:39 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_15.html

Transfer begins of highly contaminated water

The operator of the damaged Fukushima Daiichi nuclear power plant has begun transferring highly radioactive water from the No.2 reactor to a waste processing facility....

Tuesday, April 19, 2011 12:48 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_17.html

Gemba: Fukushima residents feeling discrimination

National Policy Minister Koichiro Gemba says people from Fukushima Prefecture are being discriminated against because of the radiation escaping from the damaged nuclear power plant.....

Tuesday, April 19, 2011 14:44 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_18.html

New photos show reactor building interiors

For the first time after the accident at the Fukushima plant, TEPCO has released photos of the inside of the reactor buildings. Remote-controlled robots took the pictures on Sunday and Monday to check the interior of the buildings housing the No.1, No.2 and No.3 reactors....

Tuesday, April 19, 2011 14:50 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_h16.html

Gov't to set up study group on tap water safety

Japan's health ministry is to set up a panel of experts to discuss ways to safeguard tap water from radioactive contamination.....

Tuesday, April 19, 2011 18:10 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_21.html

SDF personnel sent to nuclear zone flees in panic

A Japanese Ground Self-Defense Force member who'd been assigned to work near the damaged Fukushima Daiichi nuclear power plant has been dismissed for fleeing in panic.......

Tuesday, April 19, 2011 18:54 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_27.html

China: measures for Japanese imports appropriate

The Chinese government says it will continue a de facto import ban on all Japanese food and agricultural products.....

Tuesday, April 19, 2011 19:53 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_29.html

Tokai nuclear plant holds emergency drill

The operator of the Tokai Daini nuclear power plant in eastern Japan has conducted a drill to prepare for a complete loss of power to the plant's reactor.....

Tuesday, April 19, 2011 20:39 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_30.html

French company to decontaminate Daiichi water

French nuclear reactor maker Areva says it has agreed with the Tokyo Electric Power Company to build a facility to decontaminate radioactive water at the compound of the Fukushima Daiichi nuclear power plant......
Tuesday, April 19, 2011 21:47 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_33.html
_______________________
Yomiuri online

Challenges abound to control crippled reactors

Can Tokyo Electric Power Co. bring the four troubled reactors at its Fukushima No. 1 nuclear power plant under control within six to nine months as it announced Sunday? What challenges must it overcome before achieving its avowed goals?....

http://www.yomiuri.co.jp/dy/national/T110418004891.htm

Heat stroke adds to TEPCO workers' woes

Heat stroke is posing yet another threat to workers dealing with already hazardous working conditions at the Fukushima No.1 nuclear power plant.....

http://www.yomiuri.co.jp/dy/national/T110418004905.htm

Evacuation subsidy limited / System's narrow scope penalizes families by separating them

FUKUSHIMA--"Why can't I evacuate with my two daughters?"

Akiko Sato, 24, a resident of Iitatemura in Fukushima Prefecture, was complaining to a community administrative assistant who had come to her house to explain the village's subsidy system for evacuees leaving due to radiation leaks from the crippled Fukushima No. 1 nuclear power plant....

http://www.yomiuri.co.jp/dy/national/T110418004834.htm

High levels of radiation at 2 reactors

High levels of radiation were measured Sunday by remote-controlled robots inside the buildings that house reactors Nos. 1 and 3 of the Fukushima No. 1 nuclear plant--levels that would need to be lowered for workers to work inside the buildings, the Nuclear and Industrial Safety Agency said Monday....

http://www.yomiuri.co.jp/dy/national/T110418005050.htm
____________________
Asahi com

Poll: 41% want nuclear power generation reduced or stopped

Forty-one percent of voters said nuclear power generation should be reduced or stopped, up from 28 percent in 2007, according to an Asahi Shimbun survey conducted over the weekend. ....

http://www.asahi.com/english/TKY201104180129.html

TEPCO aims for cold shutdown in 6-9 months, but no guarantees

Tokyo Electric Power Co. has presented a two-stage scenario to stabilize the crippled Fukushima No. 1 nuclear power plant, but it is unclear whether its goals can be achieved as scheduled. ....

http://www.asahi.com/english/TKY201104180126.html

U.S. robots inspect Fukushima reactors

Tokyo Electric Power Co. used two U.S.-made robots to examine the interior of reactors No. 1 and 3 of the Fukushima No. 1 nuclear power plant, the company said April 17. ....

http://www.asahi.com/english/TKY201104180128.html
_____________________
Mainichi jp

Gov't panel releases 2 of over 2,000 radiation dispersal estimates

TOKYO (Kyodo) -- The Nuclear Safety Commission of Japan has released only two computer-simulated estimates of radioactive substance dispersal since the nuclear accident at the Fukushima Daiichi power plant, although more than 2,000 of them were made, sources familiar with the matter said Monday....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2g00m0dm007000c.html

Gov't bans shiitake mushroom shipments from Fukushima city

TOKYO (Kyodo) -- The government has banned shipments of shiitake mushrooms grown outdoors in the city of Fukushima because of higher-than-permissible radioactivity levels, Chief Cabinet Secretary Yukio Edano said Monday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2g00m0dm008000c.html

Beef brand hailing from area near Fukushima plant could face extinction

IITATE, Fukushima -- A high-end beef brand produced here is facing possible extinction with the village set to be designated for gradual evacuation and customers possibly rejecting the brand over fears about radioactive contamination.....
20110419p2a00m0na002000p_size5.jpg
20110412p2a00m0na006000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2a00m0na003000c.html

Gov't cracks down on flow of retired bureaucrats to power company jobs

As the crisis at a Tokyo Electric Power Co. (TEPCO) nuclear power plant in Fukushima Prefecture continues to rage, the government is taking a new and harder look at the flow of retiring ministry officials to senior positions at the country's electric companies.....
20110419p2a00m0na011000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2a00m0na012000c.html

TEPCO starts moving highly radioactive water to storage facility

TOKYO (Kyodo) -- The operator of the crippled Fukushima Daiichi nuclear power plant on Tuesday started moving highly radioactive water from the No. 2 reactor turbine building to another facility at the site as part of efforts to enable engineers to engage in work to restore key cooling functions of the troubled reactors....
20110413p2a00m0na014000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2g00m0dm065000c.html

Nuclear plant operators did not plan for long-term loss of power supply

Japanese nuclear power plant operators did not anticipate a long-term loss of power due to the nonavailability of outside electric sources or diesel generators in a report they filed with the government, according to a Mainichi investigation....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2a00m0na013000c.html

Nuke plant meltdown warning went unheeded

Japanese nuclear power plant operators were totally unprepared for the potential long-term loss of power supply, a lifeline to help cool nuclear reactors, according to people with knowledge of the matter.....
20110419p2a00m0na017000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/19/20110419p2a00m0na014000c.html
____________________
Sankei news

j-village
dst11041913190027-p1.jpg
dst11041913190027-p2.jpg

dst11041913190027-p3.jpg
dst11041913190027-p4.jpg


No.1 reactor
dst11041914190029-p3.jpg

No.2 reactor
dst11041914190029-p2.jpg

No.3 reactor
dst11041914190029-p1.jpg
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

part‐time F1&F2 industrial physician Takeshi TANIGAWA(professor, Ehime University) takes

4/16

Tanigawa diagnoses
snap20110420003216.jpg
meals for workers, lot of instant foods
snap20110420003134.jpg No fresh vegetable, Tanigawa says
naporitan, peperoncino and yakitori
snap20110420003143.jpg yakitori http://en.wikipedia.org/wiki/Yakitori
sleeping at gymnasium in F2
snap20110420003104.jpg worker complains of sleeplessness, Tanigawa says
break at gymnasium in F2
snap20110420003113.jpg

photo from FNN
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

TEPCO Press releases for April 19th;

(Apr 19,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00AM, April 19th)
http://www.tepco.co.jp/en/press/corp-com/release/11041901-e.html

(Apr 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 0:00 pm, April 19)
http://www.tepco.co.jp/en/press/corp-com/release/11041902-e.html

(Apr 19,2011)Transfer of high level radioactive wastewater to the Centralized Radiation Waste Treatment Facility
http://www.tepco.co.jp/en/press/corp-com/release/11041903-e.html

(Apr 19,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, April 19th)
http://www.tepco.co.jp/en/press/corp-com/release/11041904-e.html

(Apr 19,2011)Detection of trace amounts of radioactive iodine around exhaust stacks and others of Kashiwazaki-Kariwa Nuclear Power Station (continued report)
http://www.tepco.co.jp/en/press/corp-com/release/11041905-e.html

(Apr 19,2011)tatus of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 16:00PM, April 19th)
http://www.tepco.co.jp/en/press/corp-com/release/11041906-e.html

(Apr 19,2011)The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (25th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041907-e.html

(Apr 19,2011)Detection of Radioactive Material from Subsurface Water near the Turbine Building of Fukushima Daiichi Nuclear Power Station
http://www.tepco.co.jp/en/press/corp-com/release/11041908-e.html

(Apr 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 6:00 pm, April 19
http://www.tepco.co.jp/en/press/corp-com/release/11041909-e.html

(Apr 19,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (27th release)
http://www.tepco.co.jp/en/press/corp-com/release/11041910-e.html

(Apr 19,2011)Out flow of fluid containing radioactive materials to the ocean from areas near intake canal of Fukushima Daiichi Nuclear Power Station Unit 2 (continued report 15)
http://www.tepco.co.jp/en/press/corp-com/release/11041911-e.html

http://www.tepco.co.jp/en/press/corp-com/release/index-e.html
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Fukushima Daiichi Nuclear Power Station(F1) live cam
05:00 AM to 19:00 PM(up date frequency 1time/h)

4/20 13:00 PM
snap20110420130026.jpg

snap20110420132144.jpg
FUKUSHIMA.jpgjma
http://www.jma.go.jp/jma/kishou/know/e-saibun/FUKUSHIMA.pdf

NHK

Prime Minister apologizes to village mayor

Prime Minister Naoto Kan has apologized to the mayor of a village in Fukushima Prefecture for the recent nuclear accident.....

Wednesday, April 20, 2011 01:52 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_01.html

Robots face difficulties at Fukushima plant

Tokyo Electric Power Company says radioactive debris and high humidity are hampering the investigation by robots at the Fukushima Daiichi nuclear plant....

Wednesday, April 20, 2011 07:41 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_06.html

Nations mark 25 years since Chernobyl disaster

Delegates have discussed nuclear safety at an international conference to mark the 25th anniversary of the Chernobyl disaster on April 26th....

Wednesday, April 20, 2011 07:42 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_07.html

FM official: Fukushima less serious than Chernobyl

A senior official of Japan's Foreign Ministry says that although the nuclear accident at the Fukushima Daiichi power plant is ranked at the highest level of severity, it is less serious than the 1986 Chernobyl disaster.....

Wednesday, April 20, 2011 07:46 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_04.html

IAEA to send fact-finding team to Japan

The UN nuclear watchdog says it will send a team of experts to Japan to investigate the cause of the nuclear accident at the Fukushima Daiichi power plant.....

Wednesday, April 20, 2011 07:56 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_09.html

Italy freezes nuclear plant construction

The Italian government has frozen a plan to build new nuclear power plants in the country....

Wednesday, April 20, 2011 10:27 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_11.html

Transfer begins of highly contaminated water

The operator of the damaged Fukushima Daiichi nuclear power plant has begun transferring highly radioactive water from the No.2 reactor to a waste processing facility....
19_17_v_s.jpg
Tuesday, April 19, 2011 12:48 +0900 (JST)
http://www3.nhk.or.jp/daily/english/19_17.html

Govt to bar entry to nuclear evacuation zone

Chief Cabinet Secretary Yukio Edano says the government is preparing to forbid entry into the 20-kilometer evacuation zone around the troubled Fukushima Daiichi nuclear power plant....

Wednesday, April 20, 2011 13:46 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_16.html

Highly contaminated water level falls slightly

Tokyo Electric Power Company says the amount of highly radioactive water at the Fukushima Daiichi nuclear power plant is slightly lower now. TEPCO began moving the water to an on-site waste processing facility one day ago.....

Wednesday, April 20, 2011 12:55 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_14.html

Govt suspends shipment of Fukushima sand lances

The government has instructed Fukushima Prefecture to suspend shipments of a small fish caught off its coasts found to have radioactive contamination, and to warn people not to eat them....

Wednesday, April 20, 2011 14:18 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_18.html

Power loss drill at nuclear plant in Aomori Pref.

Tohoku Electric Power Company has conducted a drill at one of its nuclear plants in northeastern Japan to prepare for a potential total loss of external power to one of its reactors in an emergency....

Wednesday, April 20, 2011 18:34 +0900 (JST)
http://www3.nhk.or.jp/daily/english/20_27.html
________________
Yomiuri online

Evacuees go back to school

AIZU-WAKAMATSU, Fukushima--A new semester began here Tuesday at makeshift schools for about 590 students who have evacuated their hometown due to the crisis at the Fukushima No. 1 nuclear power plant.....

http://www.yomiuri.co.jp/dy/national/T110419004366.htm

Radioactive suits improperly disposed

FUKUSHIMA--Twelve protective suits and masks--including one suit on which a slight amount of radioactivity was detected--were found to have been improperly disposed of in Tamura, Fukushima Prefecture, which is located near the 30-kilometer exclusion zone of the Fukushima No. 1 nuclear power plant.....

http://www.yomiuri.co.jp/dy/national/T110419002350.htm

Russia lifts its warning against travel to Japan

MOSCOW--Russia has become the latest nation to lift its advisory against travel to Japan after assessing the situation as steadily returning to normal after last month's earthquake and tsunami and the ensuing crisis at a nuclear plant in Fukushima Prefecture.....

http://www.yomiuri.co.jp/dy/national/T110419004834.htm

Agency admits 'melting' of N-fuel

The Nuclear and Industrial Safety Agency has reported to a Cabinet Office safety panel that nuclear fuel pellets in the Nos. 1 to 3 reactors at the quake-hit Fukushima power station are believed to have partially melted....

http://www.yomiuri.co.jp/dy/national/T110419004267.htm
____________________
Asahi com

Residents want older South Korean nuclear plant closed

BUSAN, South Korea--By coincidence, the No. 1 reactor at the Kori nuclear power plant was not operating on the night of April 12, the day a group of local residents filed a lawsuit demanding its closure....

http://www.asahi.com/english/TKY201104190198.html

Radiation, aftershocks could slow Fukushima stabilization

High levels of radiation discovered at the Fukushima No. 1 nuclear power plant could disrupt Tokyo Electric Power Co.'s timeline for a cold shutdown of the crippled facility, TEPCO officials acknowledged.....

http://www.asahi.com/english/TKY201104190193.html

Kan signals freeze on plans to build new nuclear reactors

Citing safety concerns, Prime Minister Naoto Kan suggested freezing projects to build more than a dozen nuclear reactors by 2030, but he did not offer details on how to do it. ....
snap20110420132503.jpg
http://www.asahi.com/english/TKY201104190201.html
__________________
Mainichi jp(kyodo, AP)

Britain trims precautionary zone near Japan's crippled nuke plant

TOKYO (Kyodo) -- Britain has scaled down its precautionary zone around the crippled Fukushima nuclear plant in Japan, now advising its nationals to remain outside a 60-kilometer radius of the plant rather than the previous 80-km radius......

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm002000c.html

Japan mulls hiking power charges to help cover damages payments

TOKYO (Kyodo) -- The government is considering increasing electricity charges to help cover damages payments to people who have suffered losses on the ongoing crisis at the Fukushima Daiichi nuclear plant of Tokyo Electric Power Co., government sources said Tuesday......

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm005000c.html

Kan apologizes to head of village in expanded evacuation zone

TOKYO (Kyodo) -- Prime Minister Naoto Kan apologized Tuesday to the mayor of Iitate, a village included in the recently expanded evacuation zone due to radiation from a Fukushima nuclear power plant crippled by the March 11 earthquake and tsunami....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm007000c.html

Japan seeks 'calm response' to Fukushima accident at Chernobyl confab

TOKYO (Kyodo) -- Japan asked the international community to respond calmly to radiation leaks at the Fukushima Daiichi nuclear power plant at an event Tuesday in the Ukrainian capital of Kiev to mark the 25th anniversary of the Chernobyl accident.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm008000c.html

IAEA expects radiation leak from Fukushima nuke plant to decrease

TOKYO (Kyodo) -- The International Atomic Energy Agency expects the amount of radiation released by the crippled Fukushima nuclear plant in Japan to decrease substantially if the plant operator's work to bring it under control goes as planned, a senior IAEA official said Tuesday....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm010000c.html

Kan eyes announcing no-entry zone during his Fukushima visit

TOKYO (Kyodo) -- Prime Minister Naoto Kan is expected to announce his government will soon impose an order to prohibit people from entering within a 20-kilometer radius of the crippled Fukushima nuclear plant when he visits Fukushima Prefecture as early as Thursday, government sources said Wednesday....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm011000c.html

Powder to remove radioactive substances developed by chemist, firm

TOKYO (Kyodo) -- A chemist and a company in Japan have jointly developed a powder that can capture and precipitate radioactive substances in water and which could be used in the ongoing effort to deal with contaminated water at a crippled nuclear power plant, the chemist said Tuesday....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm034000c.html

U.S. carrier returns to Yokosuka as nuclear concerns ease

TOKYO (Kyodo) -- The U.S. aircraft carrier George Washington returned to its home port of Yokosuka, Kanagawa Prefecture, on Wednesday nearly a month after it left the base following a radiation leak at a tsunami-struck nuclear power plant in northeastern Japan.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm035000c.html

Gov't bans small-fish shipments from Fukushima as radiation level rises

TOKYO (Kyodo) -- The government banned shipments and restricted consumption of young sand lance landed in Fukushima Prefecture on Wednesday because the fry was found to be polluted with excessive amounts of radioactive materials, Chief Cabinet Secretary Yukio Edano said....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm038000c.html

Host Tsukuba city urged evacuees to hand in radiation certificates

TOKYO (Kyodo) -- The city of Tsukuba, in a controversial move, demanded that evacuees from Fukushima Prefecture, where a crippled nuclear power station is located, hand in certificates that they have received radiation screening, officials said Tuesday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm039000c.html

Fukushima nuke workers at risk of depression, overwork death

TOKYO (Kyodo) -- Tokyo Electric Power Co. workers engaged in efforts to stabilize the crisis-hit Fukushima Daiichi nuclear plant are at risk of depression or death from overwork, a doctor who recently saw them said Wednesday.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm040000c.html photo #228

Highly radioactive water removal continues, water level drops by 1 cm

TOKYO (Kyodo) -- The operator of the crippled Fukushima nuclear plant said Wednesday the level of highly radioactive water filling up one of the underground tunnels at the site has dropped by 1 centimeter, a day after work to pump out the water started toward restoring key cooling functions of its troubled reactors....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2g00m0dm078000c.html

Donations by TEPCO execs show close ties to Liberal Democratic Party

Various officials with Tokyo Electric Power Co. (TEPCO) donated more than 20 million yen to the Liberal Democratic Party (LDP) over three years since 2007, indicating a close relationship between the utility giant and the former ruling party....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2a00m0na004000c.html

High radiation levels, temperatures hinder work on crippled nuke plant

Restoration work at the tsunami-crippled Fukushima No. 1 Nuclear Power Plant is feared to be a time-consuming and difficult task with radiation levels, temperatures and humidity remaining extremely high for repair crews to work inside the damaged reactor buildings.....

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2a00m0na010000c.html

Radiation exposure standard for Fukushima students set at international maximum

The government has set the permissible hourly radiation dose at schools in Fukushima Prefecture at 3.8 microsieverts -- a level that would see students absorb the internationally recognized maximum of 20 millisieverts per year....
20110316p2g00m0dm011000p_size5.jpg

http://mdn.mainichi.jp/mdnnews/national/archive/news/2011/04/20/20110420p2a00m0na011000c.html

Workers battle to remove radioactive water from troubled nuclear reactor

Emergency workers have started transferring highly toxic radioactive water from one of the troubled reactors in northeastern Japan to another facility nearby in a crucial step that could pave the way for them to restore the reactors' cooling functions and prevent contaminated water from flowing into the ocean.....

http://mdn.mainichi.jp/mdnnews/national/news/20110420p2a00m0na018000c.html
____________________
Sankein news

dst11042013230023-p1.jpg
Minamisoma city, Fukushima pref
 
Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

Re: Japan - Fukushima Daiichi Nuclear Power Plant Crisis - Units 1 - 6 Reports, News, Graphics - March 17 +

April 20 TEPCO Press releases;

(Apr 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 9:00AM, April 20th) http://www.tepco.co.jp/en/press/corp-com/release/11042001-e.html

(Apr 20,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, April 20th)
http://www.tepco.co.jp/en/press/corp-com/release/11042002-e.html

(Apr 20,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (28th release)
http://www.tepco.co.jp/en/press/corp-com/release/11042003-e.html

(Apr 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 4:00PM, April 20th)
http://www.tepco.co.jp/en/press/corp-com/release/11042004-e.html

(Apr 20,2011)The results of nuclide analyses of radioactive materials in the air at the site of Fukushima Daiichi Nuclear Power Station (26th release)
http://www.tepco.co.jp/en/press/corp-com/release/11042005-e.html

(Apr 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 5:30 pm, April 20
http://www.tepco.co.jp/en/press/corp-com/release/11042006-e.html

(Apr 20,2011)Out flow of fluid containing radioactive materials to the ocean from areas near intake canal of Fukushima Daiichi Nuclear Power Station Unit 2 (continued report 16)
http://www.tepco.co.jp/en/press/corp-com/release/11042007-e.html

(Apr 20,2011)Improvement plan for the exact nuclide analysis at the site ofFukushima Daiichi Nuclear Power Station under instruction of NISA (Continued report 1)
http://www.tepco.co.jp/en/press/corp-com/release/11042008-e.html

(Apr 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 0:00 pm, April 20
http://www.tepco.co.jp/en/press/corp-com/release/11042009-e.html

http://www.tepco.co.jp/en/press/corp-com/release/index-e.html
 
Status
Not open for further replies.
Back
Top Bottom